Not matchmaking. Cases we saw through to execution.

These are cases where WIM directly ran everything from free diagnosis to on-site survey, design, and PoC.

Automotive Parts · Manufacturing

An unmanned night line kept stopping for a full day, cause unknown.

Result

42% less line downtime

Problem

Recurring line stops during unmanned night operation took over a day just to diagnose, throwing off the production schedule every time.

Solution

We deployed the WIM W-RC controller with integrated PLEM monitoring to detect anomalies in real time and respond remotely, immediately.

Result

Root-cause diagnosis time dropped from a full day to under 30 minutes, cutting total line downtime by 42%.

Logistics Center · E-commerce

Picking productivity was cut in half whenever a skilled worker left.

Result

65% faster ramp-up for new hires

Problem

A high-mix, low-volume picking process depended entirely on individual expertise, so productivity swung wildly with every departure.

Solution

We connected AMRs and picking stations on WIM's control OS, redesigning routing and task order so the system, not the person, standardizes the workflow.

Result

New hires now reach experienced-level productivity 65% faster, keeping output stable through staff turnover.

Food · Assembly Line

A collaborative robot was installed, but manual work crept back in.

Result

28pp higher equipment uptime

Problem

The new cobot ran on a different control scheme than the existing line, so it never fully integrated — parts of the process reverted to manual work.

Solution

PLEM unified the cobot and existing equipment under one control system, letting the whole line run as a single flow with no separate operation.

Result

The segment that had reverted to manual work was automated again, lifting overall equipment uptime by 28 percentage points.

Find out if your site qualifies with a free initial diagnosis.

Request a Free Consultation →